(1)
Pre-Foundation Investigation Using Electrical Resistivity Method: A Case Study of Proposed Phase II, Faculty of Law Building, Federal University Oye-Ekiti, Nigeria. LJSIR 2024, 2 (2), 46-53. https://doi.org/10.62050/ljsir2024.v2n2.321.